{"id":18743,"date":"2024-09-04T14:49:16","date_gmt":"2024-09-04T04:49:16","guid":{"rendered":"https:\/\/www.huonaqua.com.au\/?post_type=project&#038;p=18743"},"modified":"2024-09-13T15:14:03","modified_gmt":"2024-09-13T05:14:03","slug":"lonnavale-broodstock-ras-facility","status":"publish","type":"project","link":"https:\/\/www.huonaqua.com.au\/ja\/project\/lonnavale-broodstock-ras-facility\/","title":{"rendered":"Lonnavale Broodstock RAS Facility"},"content":{"rendered":"<p>Huon&nbsp;is&nbsp;investing&nbsp;$20&nbsp;million in regional&nbsp;Tasmania to build a new Recirculating Aquaculture&nbsp;System (RAS)&nbsp;Broodstock facility&nbsp;at our&nbsp;Lonnavale&nbsp;Hatchery&nbsp;site.<\/p>\n\n\n\n<p>The&nbsp;Lonnavale&nbsp;Broodstock&nbsp;RAS project&nbsp;strengthens&nbsp;Huon\u2019s&nbsp;commitment to&nbsp;grow fish&nbsp;longer on land, which means fish that go to sea will be larger and spend less time in the marine environment. The investment will enhance year-round&nbsp;egg&nbsp;production&nbsp;to stock&nbsp;our land-based&nbsp;growing&nbsp;facilities.&nbsp;<\/p>\n\n\n\n<p>Transitioning from the&nbsp;existing&nbsp;hatchery to&nbsp;the&nbsp;new RAS&nbsp;facility will allow&nbsp;at least&nbsp;90%&nbsp;of water to be recycled&nbsp;and&nbsp;all&nbsp;wastewater to be treated onsite before being used&nbsp;for irrigation of&nbsp;nearby farmland.&nbsp;&nbsp;<\/p>\n\n\n\n<p>This project highlights Huon\u2019s continuous innovation, pioneering industry-leading technology and practices, cementing us as a global leader in aquaculture.<\/p>\n\n\n\n<p>The project&nbsp;will generate&nbsp;around&nbsp;20&nbsp;local&nbsp;jobs during construction and&nbsp;4 new&nbsp;permanent jobs at Huon once the facility is operational.&nbsp;<\/p>\n\n\n\n<p>Huon plans to start building the new facility in&nbsp;late&nbsp;2025 (pending approvals) and aims to be fully operational by early 2026.<\/p>\n\n\n\n<p>We expect to transition existing broodstock to the new RAS facility to support stronger biosecurity outcomes and year-round egg production, noting this shift will take time. The existing flow-through facility will remain operational, ensuring support for wildlife habitats that are reliant on the freshwater output.&nbsp;<\/p>\n\n\n\n<p>Huon&nbsp;acknowledges&nbsp;previously announced&nbsp;plans to build a&nbsp;rendering&nbsp;facility&nbsp;at the Lonnavale&nbsp;site&nbsp;and&nbsp;a&nbsp;process&nbsp;is underway to determine a more suitable location for this facility.&nbsp;We remain&nbsp;fully&nbsp;committed&nbsp;to&nbsp;further&nbsp;expanding&nbsp;the&nbsp;company\u2019s management of organic waste&nbsp;and&nbsp;recycling salmon processing waste to produce&nbsp;high-grade value-added&nbsp;products.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187430\" class=\"b-accordion-head__title\">Will there be additional traffic movements&nbsp;around the site?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187430\" class=\"b-accordion-body__inner\">\n<p>There is an expected increase in traffic during construction, and once operational it\u2019s expected to be around 1 truck movement per week, and some traffic movement related to staff and light maintenance vehicles.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187431\" class=\"b-accordion-head__title\">Will I be able to see the new Broodstock RAS facility?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187431\" class=\"b-accordion-body__inner\">\n<p>Very little visual impact is expected as the facility is housed in a shed similar to Huon\u2019s existing Lonnavale facility.&nbsp;<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187432\" class=\"b-accordion-head__title\">Will I be able to hear the new facility?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187432\" class=\"b-accordion-body__inner\">\n<p>There will be noise during construction, however, this will be limited to daytime hours during weekdays. Once operational noise levels will be relatively low. A noise impact assessment will be required as part of the approval process.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187433\" class=\"b-accordion-head__title\">Will there be external lights visible at the new facility?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187433\" class=\"b-accordion-body__inner\">\n<p>Huon will also consider lighting during the design process to ensure neighbours and wildlife aren\u2019t impacted. Only a small amount of additional lighting is expected to be required and therefore visual impacts from lighting is considered negligible.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187434\" class=\"b-accordion-head__title\">Will vegetation on the site be affected?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187434\" class=\"b-accordion-body__inner\">\n<p>There will be no impact to native vegetation on the proposed site as the entire&nbsp;development will be located on already disturbed areas (adjacent to the existing facility) and agricultural land. Huon has also undertaken extensive tree-planting activities on site to reduce visual impact.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187435\" class=\"b-accordion-head__title\">How will Huon manage environmental impact?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187435\" class=\"b-accordion-body__inner\">\n<p>&nbsp;Any potential environmental impacts will be considered as part of the approval process prior to the project being granted the appropriate approvals. Assessments will include, noise, light, traffic, natural values, waste (effluent and sludges). A set of project guidelines will be issued by EPA Tasmania which will detail the required assessments to quality the potential environmental impacts and will drive required mitigation measures to minimise any environmental impact from the project.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187436\" class=\"b-accordion-head__title\">What will happen with the current Lonnavale Hatchery?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187436\" class=\"b-accordion-body__inner\">\n<p>We expect to transition existing broodstock to the new RAS facility to support stronger biosecurity outcomes and year-round egg production, noting this shift will take time. The existing flow-through facility will remain operational, ensuring support for wildlife habitats that are reliant on the freshwater output.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-ionata-accordion-block b-accordion\" data-auto-close=\"true\" data-is-animated=\"false\"><details class=\"b-accordion__container\"><summary class=\"b-accordion-head\"><h2 id=\"at-187437\" class=\"b-accordion-head__title\">Will Huon still build a rendering facility on the Lonnavale site as previously announced?<\/h2><i class=\"b-accordion-head__indicator\" aria-hidden=\"true\"><\/i><\/summary><div class=\"b-accordion-body\"><div id=\"ac-187437\" class=\"b-accordion-body__inner\">\n<p>Huon remains committed to building a new rendering facility which will recycle salmon processing waste to produce products including high quality fish meal and salmon oil for both human and animal consumption. An alternate location is being sought for this facility as the Lonnavale site is more suited to a RAS facility in line with existing usage of the site.<\/p>\n<\/div><\/div><\/details><\/div>\n\n\n\n<p>If you have any further questions or feedback, please email our Community Team:&nbsp;<a href=\"mailto:community@huonaqua.com.au\">community@huonaqua.com.au<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"414\" height=\"392\" src=\"https:\/\/www.huonaqua.com.au\/wp-content\/uploads\/2024\/09\/Lonnavale.png\" alt=\"\" class=\"wp-image-18759\" srcset=\"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/09\/Lonnavale.png 414w, https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/09\/Lonnavale-300x284.png 300w\" sizes=\"auto, (max-width: 414px) 100vw, 414px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Huon is investing $20 million in regional Tasmania to build a new Recirculated Aquaculture System (RAS) Broodstock facility at our Lonnavale Hatchery site in Lonnavale. <\/p>","protected":false},"featured_media":18556,"template":"","class_list":["post-18743","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Lonnavale Broodstock RAS Facility - Huon Aqua<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.huonaqua.com.au\/ja\/project\/lonnavale-broodstock-ras-facility\/\" \/>\n<meta property=\"og:locale\" content=\"ja_JP\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lonnavale Broodstock RAS Facility - Huon Aqua\" \/>\n<meta property=\"og:description\" content=\"Huon is investing $20 million in regional Tasmania to build a new Recirculated Aquaculture System (RAS) Broodstock facility at our Lonnavale Hatchery site in Lonnavale.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.huonaqua.com.au\/ja\/project\/lonnavale-broodstock-ras-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Huon Aqua\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-13T05:14:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.huonaqua.com.au\/wp-content\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/\",\"url\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/\",\"name\":\"Lonnavale Broodstock RAS Facility - Huon Aqua\",\"isPartOf\":{\"@id\":\"https:\/\/www.huonaqua.com.au\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg\",\"datePublished\":\"2024-09-04T04:49:16+00:00\",\"dateModified\":\"2024-09-13T05:14:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#breadcrumb\"},\"inLanguage\":\"ja\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ja\",\"@id\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#primaryimage\",\"url\":\"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg\",\"contentUrl\":\"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg\",\"width\":2560,\"height\":1708},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.huonaqua.com.au\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lonnavale Broodstock RAS Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.huonaqua.com.au\/#website\",\"url\":\"https:\/\/www.huonaqua.com.au\/\",\"name\":\"Huon Aqua\",\"description\":\"Oceans Ahead. Always.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.huonaqua.com.au\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ja\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lonnavale Broodstock RAS Facility - Huon Aqua","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.huonaqua.com.au\/ja\/project\/lonnavale-broodstock-ras-facility\/","og_locale":"ja_JP","og_type":"article","og_title":"Lonnavale Broodstock RAS Facility - Huon Aqua","og_description":"Huon is investing $20 million in regional Tasmania to build a new Recirculated Aquaculture System (RAS) Broodstock facility at our Lonnavale Hatchery site in Lonnavale.","og_url":"https:\/\/www.huonaqua.com.au\/ja\/project\/lonnavale-broodstock-ras-facility\/","og_site_name":"Huon Aqua","article_modified_time":"2024-09-13T05:14:03+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/www.huonaqua.com.au\/wp-content\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/","url":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/","name":"Lonnavale Broodstock RAS Facility - Huon Aqua","isPartOf":{"@id":"https:\/\/www.huonaqua.com.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#primaryimage"},"image":{"@id":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg","datePublished":"2024-09-04T04:49:16+00:00","dateModified":"2024-09-13T05:14:03+00:00","breadcrumb":{"@id":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#breadcrumb"},"inLanguage":"ja","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/"]}]},{"@type":"ImageObject","inLanguage":"ja","@id":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#primaryimage","url":"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg","contentUrl":"https:\/\/huonaqua-com-au.assets.ionatahosting.net\/uploads\/2024\/05\/Huon_D4_SHOT_11_773.jpg","width":2560,"height":1708},{"@type":"BreadcrumbList","@id":"https:\/\/www.huonaqua.com.au\/project\/lonnavale-broodstock-ras-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.huonaqua.com.au\/"},{"@type":"ListItem","position":2,"name":"Lonnavale Broodstock RAS Facility"}]},{"@type":"WebSite","@id":"https:\/\/www.huonaqua.com.au\/#website","url":"https:\/\/www.huonaqua.com.au\/","name":"Huon Aqua","description":"Oceans Ahead. Always.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.huonaqua.com.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ja"}]}},"_links":{"self":[{"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/project\/18743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":7,"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/project\/18743\/revisions"}],"predecessor-version":[{"id":18766,"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/project\/18743\/revisions\/18766"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/media\/18556"}],"wp:attachment":[{"href":"https:\/\/www.huonaqua.com.au\/ja\/wp-json\/wp\/v2\/media?parent=18743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}